Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
wp2_-_software_infrastructure_for_efficient_collective_productivity [2018/07/18 10:53]
mcgee [Deliverables]
wp2_-_software_infrastructure_for_efficient_collective_productivity [2019/06/27 18:24] (current)
pinaud
Line 1: Line 1:
-====== WP2: Prototype Design and Integration ​======+====== WP2: Software Infrastructure for efficient collective productivity ​======
 Outputs from the Conceptualization task (part of WP1) include organized questions and graph visualization tasks worth investigating in the application domains. From the previous analysis activities, a number of visualization prototypes will be iteratively developed and will mature over time, ┬ábased on recurrent user feedback loops. Outputs from the Conceptualization task (part of WP1) include organized questions and graph visualization tasks worth investigating in the application domains. From the previous analysis activities, a number of visualization prototypes will be iteratively developed and will mature over time, ┬ábased on recurrent user feedback loops.
 These design activities may occur in parallel in the three visualization packages (WP3-5). Although the specific focus of each work package varies, they also share common concerns. These cross-cutting aspects are the main focus of WP2, aiming at improving the productivity of the partners by sharing a common infrastructure. ​ These design activities may occur in parallel in the three visualization packages (WP3-5). Although the specific focus of each work package varies, they also share common concerns. These cross-cutting aspects are the main focus of WP2, aiming at improving the productivity of the partners by sharing a common infrastructure. ​