| - | ====== WP2: Prototype Design and Integration ====== | + | ====== WP2: Software Infrastructure for efficient collective productivity ====== |
| Outputs from the Conceptualization task (part of WP1) include organized questions and graph visualization tasks worth investigating in the application domains. From the previous analysis activities, a number of visualization prototypes will be iteratively developed and will mature over time, based on recurrent user feedback loops. | Outputs from the Conceptualization task (part of WP1) include organized questions and graph visualization tasks worth investigating in the application domains. From the previous analysis activities, a number of visualization prototypes will be iteratively developed and will mature over time, based on recurrent user feedback loops. | ||
| These design activities may occur in parallel in the three visualization packages (WP3-5). Although the specific focus of each work package varies, they also share common concerns. These cross-cutting aspects are the main focus of WP2, aiming at improving the productivity of the partners by sharing a common infrastructure. | These design activities may occur in parallel in the three visualization packages (WP3-5). Although the specific focus of each work package varies, they also share common concerns. These cross-cutting aspects are the main focus of WP2, aiming at improving the productivity of the partners by sharing a common infrastructure. | ||